SERVICE
Climate Controlled Domes for Sports
Climate-Controlled Domes Offer a Cost-effective, Adaptable, and Sustainable Solution
Elevate Your Sports Facility with TBPM and Yeadon Climate Controlled Domes
Revolutionising Sport with Yeadon Domes
Australia’s weather can be unpredictable. Rain, heatwaves, wind, and cold conditions disrupt sporting schedules and reduce usable field time, costing clubs up to 45% of annual play days.
Todd Bowden Project Management (TBPM) is proud to be an official partner of Yeadon Domes, delivering world-class, climate-controlled solutions that enable year-round access, participation, and performance—no matter the conditions.
These high-performance, air-supported structures are cost-effective, easy to install, and adaptable for a wide range of sporting and community uses.
WHY YOUR FACILITY NEEDS A DOME
Transform your venue into a multi-purpose, high-utility destination.
Yeadon’s innovative dome technology is already reshaping the future of sport in Australia. Here’s why:
- All-Weather Access: Protect your athletes and assets from rain, heat, wind, and UV exposure.
- Fast Installation & Removal:Lightweight, modular materials mean domes can go up in days, not months.
- Multi-Sport & Event Ready:Domes adapt to any configuration—tennis, basketball, netball, cricket, and more.
- Inclusive & Community-Building: Enable year-round participation for all ages, abilities, and cultural groups.
- Cost-Effective: At around a third of the cost of traditional buildings, domes make long-term financial sense.
- Energy Efficient: Engineered to minimise energy use while maximising climate stability.
- Portable & Relocatable: Domes can be moved, removed, or re-installed as needed—ideal for leased land or evolving needs.
- Revenue Generating: Maximise venue use with weather-proof event hosting, clinics, competitions and off-peak hires.
- Disaster Ready: Domes can double as emergency shelters or recovery centres in times of crisis.
YEADON DOMES VS. CONVENTIONAL CONSTRUCTION
Comparison based on a 2,000m² facility with integrated sports infrastructure:
Item | Yeadon Domes | Conventional Construction |
---|---|---|
Total Cost | ~$2.5M (incl. courts) | $6M (courts not included) |
Remote/Regional Build Feasibility | Low-cost increase, primarily in transport | High-cost escalation due to material logistics and skilled labour shortages |
Construction Time | 6–8 Months | 12–18 Months |
Take-Down Option | 1–3 Days | Not possible |
Supply Chain | Stable pricing and delivery | Prone to fluctuation and delay |
Solar Compatibility | Confirmed | Unconfirmed |
Rain Harvesting | Yes | Unconfirmed |
Maintenance Costs | $20K–$30K annually | High, design-dependent |
Let’s elevate your sports facility with a climate-controlled dome.
Contact us today to learn more and discuss your project.
Service Highlights
Build Time | 6–8 Months |
---|---|
Dismantle Time | 1–3 Days |
Initial Investment | $500K – $3M (based on scale) |
Relocatable | Yes |
Remote Site Compatible | Yes |
Rainwater Harvesting | Compatible |
Solar Panel Compatible | Yes |
Maintenance | Low – $20K–$30K/year |